Part design, mold design, simulation and toolpath generation are different skills, and treating injection molding as one task hides where the engineering work sits: in connecting the steps, which is the part John says the field isn't yet fully absorbing.

That connecting work is where the evidence runs thin in quality inspection right now. Siemens and NVIDIA's claim of up to 85 percent less engineering effort at the Siemens Erlangen factory turns out to be a project target, and an analyst cautions it has not been proven at mixed-vendor sites. John's point that good-enough tools already exist for each decomposed step is probably right; what's missing is evidence that orchestrating them across a real, messy factory floor delivers what the vendor slide promises.